March 2025 – Summer 2025
Overview
We will replace approximately three miles of natural gas line along Hilltop Road, between Canterberry Parkway and Trailway, and along Singing Hills Road, between Hilltop Road and Ruby Lane, in Parker and unincorporated Douglas County, Colorado as part of the Hilltop Road Natural Gas Project.
We are completing our work in advance of Douglas County’s Hilltop Road Improvements Project, taking place along Hilltop Road, between Legend High School and Singing Hills Road, and along Singing Hills Road, between Hilltop and Flintwood roads.

This map is a graphic and may not show exact locations.
Construction updates
Friday, June 13, 2025
During the week June 16, 2025, crews will work in the following area:
- Hilltop Road, between Crestview Drive/Village Road and Alpine Drive
- Natural gas line installation.
- Natural gas service line installation.
- Shoulder closures.
Crews will work Monday through Friday from 7 a.m. to 7 p.m. In certain circumstances, crews may work evenings, nights or weekends.
We are completing our work in advance of Douglas County’s Hilltop Road Improvements Project, taking place along Hilltop Road, between Legend High School and Singing Hills Road, and along Singing Hills Road, between Hilltop and Flintwood roads.
Additionally, crews from Comcast, Lumen, Zayo and CORE Electric Cooperative will be completing utility work in this area.
Please follow posted detours and instructions from traffic flaggers. Schedules are subject to change.
How it affects you
During construction, you may notice:
- Marking of utility lines and utility survey holes.
- Road and sidewalk closures.
- Traffic control.
- Temporary changes to access.
- Construction noise.
Installation will utilize both open trenching and boring construction methods.
- Open trenching involves digging a trench and placing the natural gas line in the trench.
- Boring uses a specialized machine to create an underground pathway through which the natural gas line is pulled or drilled.
We are committed to maintaining a safe working environment in your community. For your safety and the safety of our crews, remember these tips:
- Watch for construction crews and equipment.
- Do not enter construction areas.
- Obey signage and directions from crews.
- Reduce speeds while traveling.
- Observe parking restrictions.
- Remain flexible as work progresses and work areas change.
We’ll restore work areas to preconstruction conditions as weather allows. Work areas may be left temporarily restored after construction until we can complete final restoration.
Schedule
Construction is anticipated to begin in March 2025 and is expected to continue through summer 2025.
Construction will occur Monday through Friday from 7 a.m. to 7 p.m. In certain circumstances, we may be required to work evenings or weekends.
Schedules are subject to change.
What you can do
If you have questions or comments, we want to hear from you.
Call us at 303-312-8857 or email [email protected] to learn more.
Safety
Public safety is at the foundation of all we do. The safety of the public around our natural gas system influences every decision we make.
If you ever suspect a natural gas leak, leave your home or business immediately. Once you are safely away, call 911, then Xcel Energy at 800-895-2999.
For more information on our commitment to safety, please visit our Public Safety page.
Document library
Contact Us
Have a question or want to provide feedback?
Call 303-312-8857
Email [email protected]
Fill out the comment form above